Grid-connection applications
EAC/DSO applications and technical files for PV and storage systems, prepared under the current grid-connection rules and followed through to approval.
Electrical & energy engineering · Cyprus
From the EAC/DSO application and single-line diagram to the meter, the export limiter and the RTU, we handle the engineering that gets your PV or storage system approved, connected and running.
PV and storage projects rarely stall on the panels. They stall on paperwork, protection, metering and communications. That is the part we take care of.
Services
EAC/DSO applications and technical files for PV and storage systems, prepared under the current grid-connection rules and followed through to approval.
SLDs, panel and switchboard specifications and DXF/CAD drawings, including redrawing old or scanned panel drawings into clean, editable files.
Energy meters, CTs and export limitation, so the system respects its approved export limit. Experience with Eastron meters and Huawei SUN2000 inverters with SDongle.
RTUs for DSO/TSO monitoring and setpoint control, Modbus RTU and TCP mapping between inverters, meters and controllers, with Elseta WCC Lite experience.
Small control systems with Siemens LOGO! and similar PLCs for load control, switching logic and interlocks around generation and storage.
On-site wiring, configuration and commissioning, then secure remote access so issues can be checked and fixed without a site visit.
Monitoring & control
After connection, the system has to keep to its export limit and answer the grid operator. We set up the metering, control and communications that make that automatic.
A meter at the connection point tells the inverters how much they may export, second by second, including zero export.
The RTU passes measurements to the DSO/TSO and applies their setpoints to the inverters and the battery.
Secure remote connection to loggers, meters and controllers, so most faults can be diagnosed without a site visit.
How we work
We look at the site, the existing installation, the equipment and what the grid operator requires, and agree what the system must do.
Single-line diagram, panel specifications and the full application file, ready to submit to the EAC/DSO.
Metering, export control, RTU and communications wired, configured and tested on the live system.
Remote access and monitoring, so the system keeps running the way it was approved and changes are handled quickly.